LANCASHIRE CRICKET CLUB SPORTING FACILITY

The LCC Farington facility is a modern, dual-purpose cricket facility combining professional-level infrastructure with community access. The eye-catching pavilion building with it’s sharp angles has been constructed with an emphasis on sustainability.

The triangular roof is constructed using a Sika SikaShield RBM Inverted Roofing System comprising ballast and paving, along with 165mm of insulation to achieve a U Value of 0.18.  A 6.5m Brett Martin Glass Link Modular Rooflight was added to provide natural internal light.

Soffit’s were installed using APL Slimwall CPS/SSF in a modern SuprAnodic Bronze power coat.

The walls are clad with 75mm x 25mm thick Canadian Douglas Fir Vertical Boarded Timber Cladding, and aluminium architectural louvre to give a striking aesthetic.  150mm K-ROC Karrier Panel insulation is used to achieve a 0.12 U Value for exceptional energy efficiency. 

Features

Wall Cladding

Roof Cladding

Roofing System

Flat Roofing Specification – Sika SikaShield RBM Inverted Roofing System, comprising Ballast & Paving, SikaRoof Water-Infiltration Reduction, 165mm thick Sikatherm EPS 200 031 RJ1 Inverted Insulation to achieve 0.18 U Value, SikaShield  B79 MG (Grey Mineral) 4mm thick Torch Applied Cap Sheet,SikaShield E74 PA SA 3mm thick Self Adhesive Underlay, on 25mm thick Marine Grade Overlay, to Tata Steel D159 1.25mm thick Enamel (Bright White) Coated Steel Structural Deck (25 Year Guarantee).

Rooflight Specification – Brett Martin Glass Link Modular Rooflight, 1 run Glass Link 6500mm long x 1580mm wide, comprising 3 modules 2150mm wide, with Standard Dual Colour Frame (Anthracite), Glazed with 3Glass Panes per Module, Clear Glass, comprising 6mm Toughened Outer, 14mm Argon Filled Cavity, 9.5mm Lamited Inner, to achieve Ur Value Ur-Value 1.9 W/m2K / Ud-Value 1.37 W/m2K.

Fascia Cladding Specification – APL Slimwall CPS/SSF, 3mm thick Polyester Powder Coated (SuprAnodic Bronze) Fascia Flashings, concealed fixed to Subframe.

gallery